Hiring brief scenarios
Build the LLM Engineer brief around the work.
These scenarios connect location context to role responsibilities. Use them as prompts to verify with the employer, not as measures of San Jose demand, clients, or candidate supply.
Sourced artificial intelligence and software context
Models, products, and production services: LLM Engineer
The City of San Jose identifies artificial intelligence as a priority growth sector and includes AI training and job-matching programs in its fiscal year 2025 to 2026 economic plan. Connect the local operating context to the data that may enter prompts or retrieval. Require a candidate to explain document preparation, permissions, citation behavior, evaluation cases, and the team that approves changes. AI product work can join source data, models, application code, evaluation, user feedback, cost controls, access rules, and production support under separate owners.
Evidence to request: Request an evaluation set, retrieval diagram, or redacted design note that shows how the candidate tested grounding and access boundaries. Define the user decision, model boundary, source data, evaluation set, deployment path, access control, cost target, failure response, and approving product owner.
Sourced semiconductors and advanced manufacturing context
Engineering, fabrication, and supply controls: LLM Engineer
A July 2025 City of San Jose economic-development release names advanced manufacturing and semiconductors among the industries the city plans to attract, retain, and grow. Set the model-selection decision around the workload rather than a preferred vendor. Ask how the engineer compared hosted and open models, measured quality, handled unsafe output, and controlled latency or token cost. Semiconductor and manufacturing programs may connect product definitions, equipment, process recipes, production schedules, quality results, suppliers, inventory, maintenance, and cost records.
Evidence to request: Use a design exercise with a fixed quality target and cost limit. Score the tradeoffs, measurement plan, and fallback behavior. Set the design or plant boundary, product revision, process control, equipment interface, traceability unit, quality release, supplier handoff, change window, and support owner.
Sourced data centers and energy infrastructure context
Capacity, continuity, and facility operations: LLM Engineer
San Jose's July 2026 large energy-use project page distinguishes data centers from research laboratories, advanced manufacturing sites, electric-vehicle charging hubs, and other power-intensive facilities. Treat launch support as part of the role. The brief should cover observability, feedback review, version changes, rollback, and ownership when retrieval or model behavior produces a poor result. These facilities can combine power, cooling, networks, physical security, capacity, asset maintenance, environmental controls, backup systems, and tenant or workload commitments.
Evidence to request: Ask for an incident or regression account with the signal, diagnosis, change, and post-release check the candidate owned. Name the facility and workload boundary, capacity unit, power and cooling dependencies, availability target, access model, maintenance path, recovery test, and change authority.